RM2 Billion Kuching flood mitigation project ‘on track’

RM2 Billion Kuching flood mitigation project ‘on track’

A RM2-billion flood mitigation project involving the construction of a 8.2-km canal and a dyke from the Sarawak River
to the South China Sea is expected to overcome floods in this city by the end of the 11th Malaysia Plan period in 2020.

A RM2-billion flood mitigation project involving the construction of a 8.2-km canal and a dyke from the Sarawak River
to the South China Sea is expected to overcome floods in this city by the end of the 11th Malaysia Plan period in 2020.

Sarawak Housing and Urban Development Minister Amar Abang Johari Tun Openg said today the canal, between 200 and 300 metres wide, would stretch from the Sarawak River to Batang Salak and would have two barrages to check the
overflow of water into Kuching city.

Learn. Publish. Earn.

Got a story like this in you?

Learn to write factual stories with AI, get published on cj.my, and earn RM80–RM100 per story.

See Training Dates

From RM350 · Starting October 2026 · Penang / KL / JB

“The dyke and canal flood mitigation project began in 2009 and the widening of the river from Sungai Lemidin for a stretch of 1.5 kilometres, at a cost of RM148 million, has begun,” he told reporters after a visit to the project site
in Sungai Lemidin.

Abang Johari, who is also State Tourism and Heritage Minister, said the project took into account environmental conservation, especially preservation of the mangrove forests in Batang Salak.

He said a thorough study had been made on the implementation of the project and it was needless for the people in the vicinity to fear environmental degradation as their surroundings would be maintained in their original state.

For Malaysian SMEs Feature your business on Citizens Journal Malaysia
Editorial RM500
+ Photos RM1,000
Full Campaign RM2,500
Get featured →

– Bernama