
Sultan of Pahang Al-Sultan Abdullah Ri’ayatuddin Al-Mustafa Billah Shah officiated the ECRL KotaSAS station in Kuantan on 24 November. It is one of seven East Coast Rail Link stations in Pahang. KotaSAS is also one of only four stops for Express trains.
For travellers, the numbers matter more than the ceremony. Gombak to KotaSAS is 209 kilometres, with starting fares of RM60 on Transit trains and RM68 on Express. Express trains take about one hour 35 minutes, against roughly three hours by road.
Malaysia Rail Link (MRL) is targeting 12 December for the Gombak to Kota Bharu service. That date still depends on safety and regulatory approvals. Sultan Abdullah said the project is 99 per cent complete and has moved faster than scheduled.
ECRL KotaSAS station fares, stops and trip times

Express trains stop only at Gombak, KotaSAS, Kuala Terengganu and Kota Bharu. Transit trains stop at every station on the line. So a traveller using the ECRL KotaSAS station who wants speed should look for an Express service.
Starting economy fares are RM60 Transit and RM68 Express for Gombak to KotaSAS. Gombak to Kuala Terengganu (378 km) starts at RM95 and RM110. Gombak to Kota Bharu (523 km) starts at RM125 and RM147. The same starting fares apply in both directions.
CJ.MY worked out the cost per kilometre. KotaSAS Transit fares start at about 29 sen a kilometre, and Kota Bharu at about 24 sen. These are starting fares, so the actual price on your date may differ.
MRL says fares are dynamic and change with time of purchase, demand and seat availability. Earlier booking should give a better chance of a lower fare. Discounts are offered to children, seniors, OKU cardholders, pensioners and students. CJ.MY covered them when the fares were announced.
What the Sultan said at the ECRL KotaSAS station

Sultan Abdullah thanked the federal government and MRL, the line’s owner. He said construction had reached 99 per cent. Pahang Menteri Besar Datuk Seri Diraja Wan Rosdy Wan Ismail attended. So did MRL chairman Tan Sri Dr Shamsul Azri Abu Bakar.
He said the west coast developed faster because rail and highways arrived there first. He hopes the ECRL and the LTU highway will help the east coast catch up. Pahang has seven stations on the line.
Read more: ECRL fares from RM60: Tickets on sale mid-Nov, trains by Dec 12
Read more: Beware fake ECRL tickets as mid-November sales draw near
Read more: ECRL fares will sit between bus and plane tickets, MRL says
The Sultan asked that the stations become economic hubs and not just stops for passengers. He said every district with a station should see local business grow. Pahang’s stations are Bentong, Temerloh, Maran, Paya Besar, KotaSAS, Kuantan Port City and Cherating.
He also noted that the project passed through five prime ministers and three Yang di-Pertuan Agong. It was first proposed around 2016 and 2017. He reminded ECRL’s managers and operators to put safety first. KotaSAS was the first station to finish its system installation in May 2025.
ECRL KotaSAS station and what to check before 12 December

The 12 December date falls just after Pahang’s school holidays begin on 5 December. The Transport Ministry asked for a mid-December launch to cover the year-end school holidays. Trips in that period may fill early, so check dates before you plan.
MRL said ticket sales would open in mid-November on the official ECRL website. CJ.MY could not confirm on 24 November that booking had opened. Check the official ECRL site before you pay anyone.
Fake offers are a risk. Pahang’s consumer affairs committee chairman has warned of social media offers of cheap fares and guaranteed seats. CJ.MY’s fake ticket report lists the red flags to look for.
The first phase covers Kota Bharu to Gombak only. The second phase, from Gombak to Port Klang, is scheduled for January 2028. For now, travellers heading to the Klang Valley by ECRL will change at Gombak.












Add comment