Pulau Jerejak bridge due 2029 while heritage plans stay unsettled

A RM500 million Pulau Jerejak bridge is due in 2029, but the former leper colony and prison island still has no settled heritage plan. Here is the latest.

The Pulau Jerejak bridge will give the island its first permanent road link to Penang island by 2029. The RM500 million project is private-sector led. It follows our look at the island’s dark past as a leprosarium, quarantine station and high-security prison.

The bridge will serve a private development on about 32 of the island’s 360 hectares. Chief Minister Chow Kon Yeow says the state has no specific plan for its own land there. Private developers have put forward the proposals.

Heritage is the open question. A draft state plan suggests a museum, the former prison site and a colonial history trail. Deputy Investment, Trade and Industry Minister Sim Tze Tzin says the developer has been asked to restore heritage sites. The reports give no details.

Learn. Publish. Earn.

Got a story like this in you?

Learn to write factual stories with AI, get published on cj.my, and earn RM80–RM100 per story.

See Training Dates

From RM350 · November 2026 · Penang / KL / JB

Pulau Jerejak bridge: what the RM500 million link will carry

Herman Yahaya, CC BY 2.0, via Wikimedia Commons

The bridge is about one kilometre long, with four kilometres of connecting roads. It will have two lanes in each direction, plus pedestrian and bicycle paths. The access point is planned near the Queensbay roundabout, linking to the expressway.

Penang infrastructure committee chairman Zairil Khir Johari has given a completion target of the third quarter of 2029. Bayan Baru MP Sim has cited March 2029. Road widening is due to start in September. Preliminary site works have begun near Queensbay Mall.

The state also approved a temporary occupation licence for the 0.82-hectare bridge site in 2023. It has been renewed every year until 2026 at RM12,300 a year.

For Malaysian SMEs Feature your business on Citizens Journal Malaysia
From RM1,000
Get featured →

The current design has four lanes, two in each direction, plus pedestrian and cycle paths. Plans in 2019 said the bridge would mainly serve pedestrians, cyclists and electric vehicles. For now the island depends on boats. The boat service from the Bayan Mutiara jetty stopped when the island’s resort closed.

See also  Penang heritage status may cover 1818 paintings and old maps

Pulau Jerejak bridge and the 32-hectare development plan

About 32.37 hectares are slated for private development. Sim described a plan for a financial centre, a resort, serviced apartments and a hotel. He said it could draw banks and investors close to Bayan Lepas’s high-tech sector. The reports do not confirm which parts are in the approved scheme.

The land was once held by UDA Holdings and the Penang Development Corporation. In 2018, the Penang Island City Council gave conditional planning permission to Tropical Island Resort. That scheme included a 350-room hotel, serviced residences, condominiums, villas and shop offices.

Read more: Pulau Jerejak: A journey through its dark past

Read more: Penang state heritage list adds seven traditions, six sites

Read more: Street of Harmony in George Town holds six worship houses

Chow replied to Pulau Tikus assemblyman Joshua Woo in the state assembly on 4 November. The state has no specific plan to develop its own land on the island, he said. The proposals come from private developers and still need planning approval and land administration clearance. His reply gave no update on progress or the completion date.

Space is limited. Sim said about 85% of the island is gazetted as a forest reserve and will not be developed. Building heights are also restricted because the site lies under flight paths. Development is limited to land the developer has acquired.

Pulau Jerejak bridge and heritage: what is proposed so far

The island’s history is well documented. It held a leprosy settlement from the 1870s and a quarantine station for immigrants. It later held a prison from 1969 to 1993. Sim listed the remnants as a Catholic church, hospital buildings, prison structures and cemeteries.

See also  Rumah Tangsi, KL's 1903 yellow mansion, hosts 200+ events

The Draft Penang State Structure Plan 2040 (Review) proposes a heritage and adventure destination for the island. Ideas include an island history museum, the former prison site and a colonial history trail. It also suggests an Island Tourism Circuit linking Pulau Aman, Pulau Gedong and Pulau Jerejak. Public comment on the draft closed on 9 September.

Heritage groups have asked for more. In 2019, the Penang Heritage Trust urged a joint UNESCO listing with the Sungai Buloh Leprosarium. The chief minister said then that the state had no plan to join the submission. Penang has added six sites to its state heritage list this year. Chow’s 4 November reply did not mention the island’s heritage.

Sim said the developer has been asked to restore heritage sites on the island. The reports do not say which sites, who will pay or by when. Watch for the final state structure plan, planning approvals and a written conservation plan. The Pulau Jerejak bridge will make all three more urgent. Until the bridge opens, check how to reach the island before you plan a visit.

Avatar photo

Maran Perianen

Maran Perianen is an award-winning documentary Producer and Director, and the founder of Citizen's Journal, a citizen-generated community news portal. He is also a regionally acclaimed video journalism trainer. He has assisted media and non-governmental organisations throughout Southeast Asia roll out digital content for online publications and social media initiative.

Add comment